reference Talbrücke Krondorf

Construction Period:

26.07.2022 - 19.08.2022

Client:

Eiffage Infra Süd

Brief Description:

Setting up 2 pairs of HEB 1000 beams with 2 strand jacks, each with a capacity of 300 tons Raising the launching gantry for dismantling the support towers Lowering the launching gantry, height approx. 35 m, weight approx. 700 tons

Special Features:

Confined space conditions Installation of the 28-ton strand jack structure on 37-meter-high pillars using a 250-ton mobile crane Lowering the gantry onto a lateral transfer track