reference Demolition Neckartalübergang Heilbronn

Data and Facts

Construction Period:

March 2017 to August 2022

Client:

Bauarge A6 West

Brief Description:

  • 5 overpass structures
  • 35 underpass structures
  • Approximately 5 km of noise barriers
  • 320,000 tons of reinforced concrete
  • 22,000 tons of steel

Special Features:

  • Demolition of steel bridge (3,000 tons) over the Neckar using strand jacking and floating techniques (pontoons)
  • Explosive demolition of reinforced concrete bridge
  • Conventional demolition using cable excavators
  • Segmental excavation of bridge sections over railway tracks using large crawler cranes
  • Demolition of bridge structures in the public road network (full closure of A6 / federal and district roads)
  • Demolition within a limited time frame
  • Recycling: Crushing and processing of reinforced concrete to a core size of 0/45 and transport of recycling material
  • Recycling rate of 99%

BETRIEBSRUHE ÜBER WEIHNACHTEN UND NEUJAHR

Vom 21.12.2024 bis 06.01.2025

Ab dem 07.01.2025 sind wir wieder für Sie da.