Bridge demolition Coordinated ideal - bridge demolition by the specialist

If bridges are about to get demolished, maximum speed and minimum disturbance to traffic flow are of paramount importance. That is the reason, why we coordinate man and machine exactly in advance. 

The individual work steps are closely geared – demolition excavators with concrete cutters, excavators for processing the recycling materials and the fleet of trucks for transporting the demolished masses. Our machinery has the latest technology at its disposal. Chief construction manager, construction manager and machine operator are regularly in contact with each other. This guarantees that we can ensure a smooth process.

Additional services:

  • Own waste management centre
  • Safety of the road due to our own delivered bulk material 

 

 

Contact persons

Kurt Bicker

Dipl.-Ing. (FH)

Geschäftsfeldleiter Abbruch

Phone +49 8395 920-204

Mobile +49 172 6381554

kbicker@maxwild.com

Max Fus

Master of Engineering

Oberbauleiter Brückenabbruch

Phone +49 8395 920-244

Mobile +49 170 9162026

mfus@maxwild.com

BETRIEBSRUHE ÜBER WEIHNACHTEN UND NEUJAHR

Vom 21.12.2024 bis 06.01.2025

Ab dem 07.01.2025 sind wir wieder für Sie da.