Horizontal drilling engineering Horizontal Directional Drilling – The Science of Drilling Technology
Drilling technology - Achieve great things – in a short time
With the Max Wild horizontal drilling engineering, you can process jobs more economically than with conventional methods such as open construction or other laying techniques. With process-controlled horizontal drilling rigs, our specialists lay underground pipelines for oil, gas, water, wastewater, electricity or telecommunications – precisely, quickly and in an environmentally friendly manner. There is no need for road scarification and excavation work, and the groundwater level is not impaired.
And this is how the controlled horizontal drilling works:
- It all starts with the so-called pilot drilling. Here, the drill head strives through the ground on a precisely calculated route. The location is carried out by means of a special probe. In this way, existing pipes, tree roots or other obstacles can be circumscribed purposeful. In the next step (clearing) the borehole is widened to the required diameter.
- Finally, the last step in the controlled horizontal drilling is the inserting of the pipes.
- Thanks to latest technology and the know-how of the Max Wild professionals, which has grown over the years, horizontal drilling jobs can be completed for you within a few days.